Nothing hidden inside your walls.
Twelve stages from bare land to the final key — what we do, how we do it, what we check and what you receive at every step.
Site visit
We walk your land with you and listen: what you want to build, for whom, by when and on what budget.
Founder or senior engineer on site; access road, water, power and slope noted.
Site constraints and local approvals.
A free consultation and honest first advice.

Survey & soil
DGPS survey and contour mapping of the land; soil or rock checked where we will build.
Survey instrument readings, levels at a fixed grid, trial pits where needed.
Levels, boundaries and bearing strata.
A contour map that is yours to keep, even for your own architect.

Design
Architectural and structural drawings by our in-house team, or we build from your architect's set.
Plans, elevations, sections, structural design and services layout.
Structural safety, Vastu if wanted, views and privacy.
A complete drawing set, finalised with you.

BOQ & agreement
Every item, quantity, grade and brand written down; a stage-wise schedule agreed and signed.
Detailed BOQ from the drawings; payment linked to stages.
Quantities and rates line by line.
A transparent BOQ and a written timeline.

Site setup
Layout marked on the ground, material yard, labour stay, water and power arranged, safety boards put up.
Centre-line marking from drawings, reference pillars fixed.
Layout double-checked by engineer before digging.
Your first daily progress report.

Excavation & foundation
Excavation and rock cutting, PCC bed, footing steel, foundation concrete, anti-termite treatment, plinth beam.
Our own excavators; RMC for footings; cover blocks under steel.
Depth, footing size, steel and cover before every pour.
Foundation photos and records.

RCC frame
Columns, beams and slabs: shuttering, steel, then ready-mix concrete placed by pump and compacted by vibrator.
RMC from a batching plant; Fe550D TMT steel; curing after every pour.
Slump test on every truck, cube test at 7 and 28 days, steel check before each slab.
Photos of every slab and the test records.

Masonry
Walls in AAC blocks or fly-ash bricks with lintels and sill bands.
Thin-bed or cement mortar, true to line and level.
Line, level and plumb of every wall.
Weekly progress photos.

Electrical & plumbing
Concealed conduits, wiring, water supply and drainage lines laid before plaster.
FRLS copper wiring; CPVC / uPVC pipes; layout as per drawing.
Pressure test on water lines; circuit check.
As-built services layout.

Plaster & waterproofing
Internal and external plaster; waterproofing of roofs, toilets, sunken areas and pools.
Chicken mesh at RCC–masonry joints; branded waterproofing systems.
Ponding test for 48 hours before tiling.
Test photos and warranty details.

Finishing
Flooring, stone cladding, paint, doors, windows, fittings and fixtures.
Materials chosen with you from the brands in your BOQ.
Finish quality, alignment, joints and shades.
Material selection sessions with you.

Handover
Snag list closed, site cleaned, final walk-through, documents and keys handed over.
Joint inspection room by room.
Every item on the snag list closed.
Keys, drawings, warranties and our support after handover.

What goes into your building.
Our standard specification. Every project gets its own BOQ with exact grades and brands, agreed before work begins.
| Part of building | Material & method | Brands |
|---|---|---|
| 01Foundation | RCC footings in ready-mix concrete over PCC bedAnti-termite treatment, plinth beam, compacted backfill | UltraTech / ACC · Tata / JSW |
| 02RCC frame | Columns, beams and slabs in M25 RMC, pump-placedFe550D TMT steel, cover blocks, vibrator compaction, curing | Tata Steel / JSW / SAIL |
| 03Masonry | AAC blocks or fly-ash bricksLintels and sill bands, true to line and level | As per BOQ |
| 04Plaster | Double-coat external, single-coat internalChicken mesh at RCC–masonry joints | Branded cement |
| 05Waterproofing | Roofs, toilets, sunken areas and pools48-hour ponding test before tiling | Dr. Fixit / Fosroc / Sika |
| 06Electrical | Concealed FRLS copper wiring, MCB / RCCB protectionModular switches | Havells / Polycab / Legrand |
| 07Plumbing | CPVC supply, uPVC / SWR drainagePressure-tested | Astral / Supreme / Ashirvad |
| 08Finishes | Tiles or stone, branded paint, fittings as per finish levelSelected with you | Kajaria · Asian Paints · Jaquar / Kohler |
Checked before it is covered.
Once concrete is poured or plaster is done, mistakes are hidden forever. So we check first — and record it.
Slump test on every RMC truck
Workability checked on arrival; a truck out of range is sent back.
Every pourConcrete cube test
Cubes cast from each pour and tested at 7 and 28 days.
7 & 28 daysSteel check before every slab
Bar size, spacing, laps and cover blocks checked by our engineer.
Before each pourCuring log
Water curing after every pour, recorded in the daily report.
DailyPressure test on water lines
Supply lines tested for leaks before they are plastered in.
Before plasterPonding test
48-hour water test on roofs, toilets and sunken areas before tiling.
Before tilingWatch your building rise — from anywhere.
Every evening you get a report on WhatsApp: what was done, labour on site, material received, tests done and photos.
- Work done today, block by block
- Labour and machinery on site
- Material received with brand
- Tests and checks done
- Photos from site

A dedicated team on every site.
Site manager
Your single point of contact, responsible for the whole site.
Supervisor
On site every day, running work, material and safety.
Engineers
Planning, structure and quality checks at every stage.
Skilled workforce
Masons, steel fixers, carpenters, stone and finishing crews.
Ready for stage one? Book a free site visit.